Brookton

The Brookton project saw HTS support CDM projects and CBH Group. The works included site preparations, the installation of submains and Main Switch Board, new sewage pump station, septic and leach drain system, building foundations, installation of accommodation and amenities, concrete verandas and weather protection, testing, commissioning and preparations for occupation.

HTS was able to provide a single contractor and point of contact for all electrical, plumbing and building works.

GinGin Works

HTS was contracted by CDM to provide refurbishment works for previously used accommodation and amenities modules to be used in the future. The works included internal fit out and rectification of punch list works, electrical compliance including replacement of switchboards and wiring, replacement of plumbing fittings and repair of transit damage.

These works combined multiple trades under a single contractor allowing flexibility, efficiency and an accelerated program with no lost time.